Start the MOC. The PHA starts with it.
An MOC can be opened before its hazard review is done, so the PHA runs inside the change instead of ahead of it. Reviewers can read along, but sign-offs wait for the PHA, and start-up waits for the evidence.
- Change types that fit. Equipment, process and procedure changes, plus control changes like cause and effect, setpoints and logic.
- A PSI change register. Every drawing and document the change touches, redlined by operations, revised by drafting and verified by engineering.
- Close-out on evidence. Klepra won't let the MOC close with open actions, unrevised drawings, untrained people or an unsigned PSSR.
- Emergency changes. They follow your site's emergency MOC procedure. Klepra records the co-signed authorization and tracks the full review and PHA to the deadline your company sets.
- One record package. The MOC, PHA, PSI change records, training roster and PSSR print together.
Start-up in Klepra means the MOC's records are complete and the PSSR is signed. Authorizing the physical start-up stays with your authorized personnel.