Process safety management

PSM records that stay connected to the plant.

The PSM dashboard reads the registers your site keeps in Klepra: assets, documents, permits, inspections and changes. Each element shows what's on file, what's due and what's missing, with a link to the record behind it.

The PSM dashboard: one tile per element of 1910.119, with its status, a headline count and the facts behind it.
Fictional demo data · Tile states reflect the demo plant's recordsView full size ↗
Available

Start the MOC. The PHA starts with it.

An MOC can be opened before its hazard review is done, so the PHA runs inside the change instead of ahead of it. Reviewers can read along, but sign-offs wait for the PHA, and start-up waits for the evidence.

  • Change types that fit. Equipment, process and procedure changes, plus control changes like cause and effect, setpoints and logic.
  • A PSI change register. Every drawing and document the change touches, redlined by operations, revised by drafting and verified by engineering.
  • Close-out on evidence. Klepra won't let the MOC close with open actions, unrevised drawings, untrained people or an unsigned PSSR.
  • Emergency changes. They follow your site's emergency MOC procedure. Klepra records the co-signed authorization and tracks the full review and PHA to the deadline your company sets.
  • One record package. The MOC, PHA, PSI change records, training roster and PSSR print together.

Start-up in Klepra means the MOC's records are complete and the PSSR is signed. Authorizing the physical start-up stays with your authorized personnel.

A draft MOC for adding a level transmitter on V-205, with its PHA in progress, classification, pending sign-offs and progress steps.
Fictional demo dataView full size ↗

29 CFR 1910.119

Where each element stands today.

We'd rather tell you straight. This is the state of the product, element by element, not a statement about any site's compliance.

Available
Works end to end in the current product.
Preview
Built, but depends on a site integration or setup step that isn't available yet. Demos run on simulated or demo data.
Partial
The records and tracking are in. The full workflow is on the roadmap.
Planned
Specified, not built.
  • 1910.119(c)Partial

    Employee participation

    The plan as a controlled document; participation shows through PHA teams and sign-offs. Consultation tracking planned.

  • 1910.119(d)Available

    Process safety information

    Asset design data, P&IDs and documents, operating limits and relief devices, checked for gaps.

  • 1910.119(e)Partial

    Process hazard analysis

    PHA for changes, with your risk matrix and tracked recommendations. Unit PHA register and revalidation planned.

  • 1910.119(f)Available

    Operating procedures

    Controlled procedures with revisions and annual certification due dates.

  • 1910.119(g)Partial

    Training

    MOC training rosters write training records. Initial and refresher programs planned.

  • 1910.119(h)Partial

    Contractors

    Orientation and site sign-in forms, with orientation expiry tracked. Contractor evaluation planned.

  • 1910.119(i)Available

    Pre-startup safety review

    PSSR checklists tied to the MOC. The MOC can't be marked started up in Klepra until the PSSR is signed.

  • 1910.119(j)Available

    Mechanical integrity

    MI classes, inspection schedules, readings, findings, relief devices and corrective work.

  • 1910.119(k)Available

    Hot work permit

    Hot work on your form, attached to the Safe Work Permit with gas tests and fire watch.

  • 1910.119(l)Available

    Management of change

    Permanent, temporary and emergency changes, with PHA, PSI changes, training, PSSR and close-out checks.

  • 1910.119(m)Partial

    Incident investigation

    Incident and near-miss reporting with tracked recommendations. Investigation workflow planned.

  • 1910.119(n)Partial

    Emergency planning and response

    Emergency plans as controlled documents. Drills and headcount planned.

  • 1910.119(o)Partial

    Compliance audits

    Three-year audit due tracking and finding actions. Audit protocol planned.

  • 1910.119(p)Planned

    Trade secrets

    Access control for trade-secret PSI, with confidentiality agreements.

Statuses last reviewed October 20, 2026. They change as modules ship; ask us for the current list.

What software can and can't do

Klepra helps you keep the records and run the workflows behind a PSM program, and it holds steps in order inside the record. It doesn't certify compliance with OSHA 1910.119, EPA RMP or any other rule. That comes from your program, your procedures and the people who carry them out.

References to standards on this site describe the workflows Klepra supports. They aren't a claim of certification or endorsement.

Next step

Walk an MOC through Klepra with your PSM lead.

We'll take one of your typical changes from initiation through PHA, PSI updates, training, PSSR and close-out on the demo plant, and show what each record looks like.