The platform

Every module shares the same plant.

Klepra is a shared core of equipment, people and records, with modules on top. Each module is useful by itself. Together, the permit knows the work order, the work order knows the isolation, and the handoff knows all three.

How it fits together

A shared core, with modules on top.

Modules don't keep their own copies of the plant. They read and write the same equipment register, the same people and roles, and the same record rules.

Shared core

Equipment and asset hierarchy · people, roles and plants · company forms · numbering, signatures, locking and record history · inbox, approvals and action items

  • Round → finding

    A bad reading on a round becomes a work request, linked back to the reading that raised it.

  • Request → permit → isolation

    The permit's hazards decide which forms the job needs, and the work order shows where each one stands.

  • Handoff → follow-up

    Open work, permits, isolations and bypasses carry into the shift handoff, acknowledged item by item.

Your company configures
People, plants and roles; what each role sees and can sign; MOC sign-off slots and the risk matrix; round sheets and draft forms. All from the admin screens.
We set up with you
Your approved company forms, transcribed as they are; the asset register import from your CMMS export; report layouts that match your workbook; any integration your site needs.

Shift operations

The shift's work, in one place.

Log entries by area and category, a handoff built from what's actually open, rounds on a phone, and the morning report in your own workbook layout.

  • Shift log and handoffAvailable
  • Rounds on desktop and phoneAvailable
  • Morning report and Excel exportAvailable
  • Process screens, alarms and trendsPreview

Process screens, alarms and trends are in the product and run on a simulated plant in the demo. Using them with plant data needs the read-only feed, which is planned. Acknowledging or shelving an alarm in Klepra is a record for the shift. It never touches your control system, and your DCS or SCADA stays the authority.

The Klepra overview on a phone: jobs assigned to you, equipment search, and open jobs with their status.
Fictional demo data

A process lab on a simulated amine unit

Run test scenarios on a fictional amine treating unit and watch feed gas, lean circulation and treated-gas values respond. It's a sandbox for training and what-ifs, separate from your control system.

The amine treating process lab on a fictional training unit, with feed gas, lean circulation and treated-gas values and the process overview.
Simulated unit · Fictional demo dataView full size ↗

Permits & lockout

Your Safe Work Permit, with the packet built for you.

The permit is the parent record. Its hazards decide which forms attach: isolation, confined space, hot work, fall protection, excavation. Each one is your company's own form.

  • Permit lifecycle. Issue, accept, suspend, revalidate and close, with gas tests and signatures on the record.
  • Lockout / tagout. Points from the equipment's procedure, applied and verified, with personal locks on and off and a full log.
  • Safety device bypasses. What's bypassed, why, compensating measures, notifications and return to service.
  • A record that holds the line. The record won't let isolation points be cleared while a personal lock is still logged on.
  • Prints like your paper. Same form number and wording, with signatures and times filled in.
  • Safe Work Permit and attached formsAvailable
  • Lockout / tagout recordsAvailable
  • Safety device bypassesAvailable

Klepra keeps the records and enforces the order of steps in the record. Applying isolation, verifying zero energy and authorizing work happen in the field, by your qualified people, under your procedures.

Safe Work Permit PTW-2026-8107 on a phone, with its equipment, work order and validity window. In the demo data this permit has expired.
Fictional demo data

Maintenance & assets

Work orders that carry their safety picture.

Requests, planning, scheduling and execution in one flow. A job that needs a permit or isolation can't be marked started in Klepra until both are recorded, and can't be completed while the permit is open or locks are still on.

  • Requests that remember where they came from. Each one links back to the reading, log entry or finding.
  • Asset register. Imported from your CMMS export with its hierarchy, design data and relief relationships.
  • Preventive maintenance. Calendar and run-hour schedules that raise approved work when due.
  • Parts and procedures. Inventory issued to the job, and the procedure suggested from the equipment.
  • Work requests and work ordersAvailable
  • Preventive maintenance schedulesAvailable
  • Asset register import from a CMMS exportAvailable
  • Parts and inventoryAvailable
  • Ongoing CMMS syncPlanned
A corrective work order to repair the amine contactor coating, with its tasks, the linked isolation and permit, and a prompt that a valid permit form is still required.
Fictional demo dataView full size ↗

Mechanical integrity

Inspection plans that follow the equipment.

Each covered asset gets an MI class with its basis and interval. Inspections record readings and findings, failed results raise the corrective work, and the gaps stay visible.

  • Relief devices. Set pressure, capacity and protected equipment. Pop test results outside the ASME Section VIII set-pressure tolerance are flagged for your engineer's review.
  • Findings with a disposition. Deficiencies tracked from discovery through engineering acceptance to closure.
  • Search the register. Find any covered asset by tag, class, unit or state.
  • Mechanical integrityAvailable
  • Relief device registerAvailable
The PSM dashboard: one tile per element of 1910.119, including mechanical integrity, each with its status and the counts behind it.
PSM dashboard, where mechanical integrity is one element · Fictional demo dataView full size ↗

How a job flows

One job, from the round to the next shift.

A coating repair on the amine contactor, followed through Klepra. Every step is a record linked to the one before it.

Step 1, from the launch film: a reading of 6.2 on the amine contactor DP recorded on a phone during a round.
01 Find · From the launch film
Step 2: the work order with its tasks, the asset, and the linked permit and isolation.
02 Plan · Fictional demo dataView full size ↗
Step 3: the Safe Work Permit record with its work order, validity window and next step. In the demo data this permit has expired.
Step 3: the Safe Work Permit record on a phone. In the demo data this permit has expired.
03 Authorize · Fictional demo data
Step 4: the isolation record with its points applied, the before-work checks and the personal lock register.
Step 4: the isolation record on a phone.
04 Isolate & work · Fictional demo data
Step 5: the shift log and the open items carried into the handoff for the next crew.
05 Hand over · Fictional demo dataView full size ↗

Approvals in Klepra record who decided what, and when. They don't replace your site's field authorization, gas testing or isolation verification.

Module directory

Everything, with where it stands.

Available works end to end today. Preview is built but needs a site integration or setup step. Partial has the records but not the full workflow. Planned isn't built yet. Statuses last reviewed October 20, 2026.

Shift log and handoff

Available

Rounds on desktop and phone

Available

Morning report and Excel export

Available

Process screens, alarms and trends

Run on a simulated plant today. Plant data needs the read-only OT feed, which is planned.

Preview

Safe Work Permit and attached forms

Available

Lockout / tagout records

Available

Safety device bypasses

Available

Work requests and work orders

Available

Preventive maintenance schedules

Available

Asset register import from a CMMS export

Available

Ongoing CMMS sync

Scoped per site.

Planned

Parts and inventory

Available

Mechanical integrity

Available

Relief device register

Available

Management of change

Available

PHA for changes

Available

Inbox and approvals

Available

Action items

Available

Company forms

Available

Roles, companies and plants

Available

Cloud app on Cloudflare with managed Postgres

Available

Company sign-in (email, Google, Microsoft)

Built on Supabase Auth. Email sign-in is connected on the hosted app; Google and Microsoft are set up per deployment.

Preview

Facility edge for internet outages

Planned

Read-only OT data feed

Planned

Working through an internet outage

Rounds and shift-log entries save offline and sync later. Permits, lockout and approvals need a connection.

Partial

Next step

See the modules your site would use, working together.

We'll walk through the modules that matter to your site on the demo plant, show how the records connect, and be clear about what's available today and what's still planned.